South San Francisco Scavenger SMARTFERM Anaerobic Digestion Facility

I recently went on a tour of the South San Francisco Scavenger SMARTFERM anaerobic digestion facility. Built in 2015, the facility can process 11,000+ tons per year – using methane produced as energy for the facility and as fuel for the 10+ CNG collection trucks.

One of the first things noticed on the tour is the space constraints. Less than 100 yards away from the digester is a parking structure and the Genentech executive building. These constraints require the facility to have a small footprint with tight odor controls while balancing the need to process as much material as possible. The SMARTFERM technology solves this balancing act.

AD overview

The key to successful anaerobic digestion is the carbon to nitrogen ratio (C:N) of input material. At SSF, various feedstocks are mixed for this optimized ratio prior to digestion. Generally, brown or woody material has a high ratio and green material or food waste has a low ratio.

While waiting for an available digester chamber, the material is stored in the aeration bay. The bay is under negative pressure (i.e., vacuum) for odor control. Once added to a digestion chamber, a 21 day, 3-phase process begins.

Start Phase: Anaerobic digestion only occurs in a specific temperature range. To bring material into this range, a heat-generating, aerobic decomposition process is started by pumping air into the chamber allowing the material to heat itself up naturally! It’s a clever solution with lower energy requirements than heating up the material with steam or hot air.

Fermentation Phase: Once at the correct temperature, percolate with bacteria similar to a cow’s digestive tract is sprayed onto the material, starting digestion and producing biogas. The key indicators during fermentation is quality and quantity of methane produced. Unfortunately, high quality doesn’t occur during times of high quantity. To increase quality, CO2 and other components are filtered out.

Termination Phase: After ~20 days, methane production has been greatly reduced and doesn’t make sense to continue. To stop the process, percolate is no longer sprayed onto the material. Air is again added to the chamber but this time to purge the chamber of methane and create a safe/non-explosive environment to open the chamber and allow the removal of digestate.

Remaining digestate is treated in an IVC (In-Vessel Composting) tunnel to compost the material. The tunnel also removes ammonia gas produced and processes it with an acid scrubber where sulfuric acid is sprayed over the gas to precipitate out the ammonia as ammonium sulfate. Scrubbed gas then passes through a BioFilter similar to the flora on a forest floor – removing odors and harmful gases – and into the atmosphere. The compost produced is screened offsite and sold to farms!

Screen Shot 2016-08-27 at 6.45.56 AM

Overall, the facility is an example of anaerobic digestion which is financially viable while dealing with space and odor constraints.

Although not a substitute for the tour, there is a great YouTube video summarizing the process: https://www.youtube.com/watch?v=XcjAgEYoFJE

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s